At 02:00 on a November night, German consumption sits at 43.3 GW against domestic generation of 38.6 GW, requiring approximately 4.7 GW of net imports. Thermal generation dominates: brown coal contributes 10.7 GW, natural gas 11.7 GW, and hard coal 3.7 GW, together accounting for 67.6% of supply. Wind generation is modest at 7.6 GW combined (onshore 2.8, offshore 4.8), consistent with the near-calm 0.7 km/h surface winds measured in central Germany. The day-ahead price of 230 EUR/MWh is elevated, reflecting the reliance on expensive gas-fired marginal units during a period of low renewable availability and firm overnight demand.
Grid poem Claude AI
Beneath a starless vault of coal-black cloud, the furnaces breathe their ancient carbon hymn while turbines barely whisper on the moor. The grid reaches beyond its borders, drawing current through the dark like a cold breath drawn in winter.
Generation mix
Wind onshore 7%
Wind offshore 13%
Biomass 10%
Hydro 2%
Natural gas 30%
Hard coal 10%
Brown coal 28%
32%
Renewable share
7.6 GW
Wind (on + offshore)
0.0 GW
Solar
38.6 GW
Total generation
4.6 GW
Net import
230.0 EUR/MWh
Day-ahead price
6.3°C / 1 km/h
Temp / Wind speed
Open-Meteo, Kassel (51.3°N 9.5°E) · surface estimate from 100 m wind
100.0% / 0.0 W/m²
Cloud cover / Radiation
448
gCO₂/kWh
Image prompt
Brown coal 10.7 GW dominates the left third of the scene as a cluster of massive hyperbolic cooling towers with thick white-grey steam plumes rising into blackness; natural gas 11.7 GW fills the centre-left as a row of compact CCGT power plants with tall single exhaust stacks emitting thin heat shimmer and lit by sodium-orange floodlights; hard coal 3.7 GW appears centre-right as a smaller coal-fired station with a single large chimney and conveyor belts visible under industrial lighting; wind offshore 4.8 GW occupies the far right as distant offshore turbines whose red aviation warning lights blink above a dark sea horizon; wind onshore 2.8 GW is rendered as a handful of three-blade turbines on a low ridge, their rotors barely turning, nacelles lit faintly by navigation beacons; biomass 4.0 GW appears as a modest wood-chip-fired plant with a short stack and warm amber glow from its furnace building near centre; hydro 0.8 GW is a small run-of-river weir structure in the foreground with dark water reflecting orange industrial light. TIME: 02:00 at night — completely dark sky, no twilight whatsoever, deep black overhead with full 100% cloud cover blocking all stars, no moon visible. The atmosphere is heavy and oppressive, thick low clouds pressing down, reflecting the orange-sodium glow of the industrial installations upward into a murky haze. Temperature 6°C in early November: bare deciduous trees with no leaves, damp ground, patches of mist clinging to a small river in the foreground. The scene is rendered as a highly detailed oil painting in the tradition of 19th-century German Romantic landscape art — rich impasto brushwork, dramatic chiaroscuro between deep shadow and harsh artificial light, atmospheric depth with layers of industrial haze receding into darkness. Each technology rendered with meticulous engineering accuracy: lattice towers for wind turbines, aluminium nacelles, hyperbolic concrete cooling tower shells with internal condensation visible, gas turbine air intakes and heat recovery steam generators. No text, no labels.
Grid data: 2 November 2026, 02:00 (Berlin time) · Generated 2026-11-02T01:20 UTC · Download image